Categories

Company: Shandong Zhongjing Solar Energy Co.,Ltd

Factory address:No.6 Taikang Road, Economic & Development Zone of Weishan County, Jining City, Shandong Province, China

Contact person:Jeffery Yan

Mobile:0086 15206715713

Tel: 0086 537 5031068

Fax: 0086 537 5031002

Email: international@cnsdpv.com

Skype: jefferypv1029

WhatsApp: 008615206715713

WeChat: 008615206715713

Website: http://www.cnsdpv.com

Home > News > Content

Brief Introduction Of Solar Panel Assembly Technology

1, battery test: the performance of the battery because of the random, the performance of the battery performance is not the same, so in order to effectively match the performance of similar or similar batteries, it should be based on its performance parameters for classification; They are sorted by testing the output parameters (current and voltage) of the battery. To improve the utilization of the battery, to make the quality of qualified battery components.

2, the front welding: the convergence is connected to the front of the battery (negative) on the main grid line, the convergence zone for the tinned copper, we can use the welding machine in the form of multi-point spot welding in the main grid on-line. The heat source for welding is an infrared light (using the thermal effect of infrared). The length of the tape is about twice the length of the battery. The extra welding tape is connected to the back electrode of the rear battery sheet when it is welded on the back side